Regional Operations / Middle East

TESPL in the Middle East

Delivering HDD and Microtunnelling across KSA, UAE, and Bahrain since 2022.

3

Countries — KSA · UAE · Bahrain

10+

Projects Delivered

25+

Crossings Completed

48"

Largest HDD Diameter Executed in the Region

Track Record

Major Gulf Programmes & Crossings

TESPL is an HDD contractor in Saudi Arabia and a microtunnelling contractor serving the UAE and Bahrain. Explore our NEOM Sindalah crossings in KSA and the EWA Bahrain feeder line project.

12 projects

Trenchless

East to West Pipeline Project Section – 1

HDD

East to West Pipeline Project Section – 1

327 & 406 Mtrs / 48" + 6 " / ADNOC / Cross road / Ruwais

Ruwais
TAT INTEGRATED CONST’N MAIN — TESPL HDD project in BahrainHDD

TAT INTEGRATED CONST’N MAIN

30 Mtr / 20 Inch Dia Steel Pipe / BAPCO / Bahrain

Bahrain
220 KV REINFORCEMENT AND DIVERSION CABLE WORK & 400KV LOOP CIRCUIT- PACKAGE B2 — TESPL HDD project in BahrainHDD

220 KV REINFORCEMENT AND DIVERSION CABLE WORK & 400KV LOOP CIRCUIT- PACKAGE B2

12777.29 Mtr, Total 37 Crossings / Bundle of 200 mm +110 mm / ELECTRICITY & WATER AUTHORITY (EWA) / Bahrain

Bahrain
220 Kv HIDD-ALFATEH FEEDEER 1 & 2 — TESPL HDD project in BahrainHDD

220 Kv HIDD-ALFATEH FEEDEER 1 & 2

1100 Mtr & 1178 Mtr (2 Nos Crossings) / ELECTRICITY & WATER AUTHORITY (EWA) / Bahrain

Bahrain
Master Gas System Expansion Phase – 3, Package 8 — TESPL HDD project in Kabshan (Madinah Region KSA)HDD

Master Gas System Expansion Phase – 3, Package 8

509.43 Mtr / 56'' Steel Pipe / L&T / Saudi Aramco / Kabshan (Madinah Region KSA)

Kabshan (Madinah Region KSA)
MGS Expansion Phase -3 ,Package 17 — TESPL HDD project in Jizan KsaHDD

MGS Expansion Phase -3 ,Package 17

733.80 Mtr / 30'' Steel pipe +4'' Hdpe Pipe / KPIL / SAUDI ARAMCO / Jizan Ksa

Jizan Ksa
33 KV Subsea Cables for Shusha Island — TESPL HDD project in Shusha Island (Tabuk Region KSA)HDD

33 KV Subsea Cables for Shusha Island

851.04 Mtr / 500 mm HDPE Pipe / R.S.C.C/ NEOM / Shusha Island (Tabuk Region KSA)

Shusha Island (Tabuk Region KSA)
Temporary Water Line For Sindalah Island — TESPL HDD project in Sindalah Island (Tabuk Region KSA)HDD

Temporary Water Line For Sindalah Island

1393 Mtr / 830 mm HDPE Pipe + 630 mm HDPE Pipe / R.S.C.C/ NEOM / Sindalah Island (Tabuk Region KSA)

Sindalah Island (Tabuk Region KSA)
NEOM UTILITY SUPPLY TO SINDALAH ISLAND — TESPL HDD project in Sindalah IslandHDD

NEOM UTILITY SUPPLY TO SINDALAH ISLAND

19250 Mtr / 14'' Steel pipe +18'' Steel pipe + 20'' Steel pipe / R.S.C.C/NEOM / Sindalah Island

Sindalah Island
Reroute Gas & Condensate Pipelines - Midyan duba — TESPL HDD project in Duba KSAHDD

Reroute Gas & Condensate Pipelines - Midyan duba

171 Mtr / 16'' steel pipe +4'' HDPE / L&T/ SAUDI ARAMCO / Duba KSA

Duba KSA
Zuluf Downstream Pipelines Project — TESPL HDD project in Dhahran Jubail Highway CrossingHDD

Zuluf Downstream Pipelines Project

525 Mtr / 42'' / Dynex/ Saudi Aramco / Dhahran Jubail Highway Crossing

Dhahran Jubail Highway Crossing
Jafurah Field Deveopment Export Pipelines — TESPL HDD project in Abqaiq KSAHDD

Jafurah Field Deveopment Export Pipelines

3280 m / 36" / L&T / Saudi Aramco / Abqaiq KSA

Abqaiq KSA
Regional Partnerships

Gulf Clients & Partners

  • Saudi Aramco logo

    Saudi Aramco

    KSA

  • ADNOC logo

    ADNOC

    UAE

  • TAQA logo

    TAQA

    UAE

  • NEOM logo

    NEOM

    KSA

  • EWA — Electricity & Water Authority logo

    EWA — Electricity & Water Authority

    Bahrain

  • Al Kooheji logo

    Al Kooheji

    Bahrain

  • Rawabi Specialised Contracting logo

    Rawabi Specialised Contracting

    KSA

  • L&T Hydrocarbon Saudi logo

    L&T Hydrocarbon Saudi

    KSA

  • Bin Asheer logo

    Bin Asheer

    UAE

  • CPECC logo

    CPECC

    KSA

Engineering Excellence

What We Bring to the Gulf

TESPL's Middle East operations are backed by the same fleet, engineering capability, and project management infrastructure that has delivered some of India's most technically complex trenchless installations. All equipment is TESPL-owned — no third-party rental dependency on critical machinery.

In the Gulf, TESPL has executed HDD and microtunnelling across oil and gas pipelines, utility corridors, and power and water infrastructure — for Saudi Aramco, ADNOC, NEOM, and EWA. The range of diameters executed in the region spans 14" to 48" in HDD and 813mm to 1067mm in MT.

Horizontal Directional Drilling

Long-distance and large-diameter bores · 50T to 500T fleet · Intersection method capability

Microtunnelling

Precision pipe installation · Up to 3000mm diameter · Urban and coastal environments

Pipe Thruster

Proprietary TESPL system · 150T to 750T · Deployable on any HDD project

Regional Offices

Middle East Presence & Contacts

KSA — Registered Entity

Trenchless Engineering Services Co. Ltd LLC

Building No. 6750, Office No. 1, King Fahd Bin Abdul Aziz Road, Al-Jisr District, Alkhobar, KSA

Phone: +966 135013421

Regional Contact

Santhosh Koolanghat · Regional Director

UAE — Registered Entity

Trenchless Pipelines Construction LLC

Office No. 1104, Building No. C-34, Sector E-6, Al Danahi, Abu Dhabi

Phone: +971 2 6266613

Regional Contact

Regional Management Team

Bahrain — Branch Operations

Nextlevel Trenchless Construction WLL

Office No. 12, Building No. 100, Block No. 104, Road No. 405, Hidd, Bahrain

Phone: +973 35117628

Regional Contact

Santhosh Koolanghat · Regional Director

Brochure Download

For full brochure and global project references visit trenchless.in