NEOM Sindalah Temporary Water Line
4 MT Drives | 1,393m total | 813mm (32")
Back to Middle East ProjectsProject Overview
Execution & Technical Scope
Four microtunnel drives for the temporary water supply line serving the Sindalah Island development.
The project scope includes trenchless installation, site preparation, drilling operations, and pipeline installation for NEOM.
Site Photos & Visual Records
Trenchless
NEOM Sindalah Temporary Water Line - Site Operation
Key Statistics
- Length1,393m total
- Diameter813mm (32")
- MethodMT
- Client / OwnerRawabi Specialised Contracting / NEOM
- LocationKSA
- Year Completed2023–2024