The Fugale Hill crossing is, to TESPL's knowledge, the first HDD crossing of this profile ever executed globally — a J-profile bore through hard rock with a 181-metre elevation difference between rig side and pipe side, at a 13-degree angle, over 950 metres.
The geology presented compressive strength of 153 MPa throughout — among the hardest rock conditions encountered in HDD operations in India. The combination of hard rock, a steep ascending profile, and gravitational/friction loads required deployment of TESPL's proprietary 500-tonne pipe thruster.
Site Photos & Visual Records
Trenchless
Fugale Hill - Site Operation
Key Statistics
- Length950m
- Diameter24"
- Depth135m
- Elevation Diff181m
- GeologyHard rock · Compressive strength 153 MPa
- EquipmentTESPL 500T pipe thruster
- Client / OwnerL&T
- LocationMaharashtra, India