HDD / Bihar, India

Ganga River Crossing

4,027m / 26" main line + 6" auxiliary line / Numaligarh Refinery Ltd / Engineers India Ltd / Bihar, India

Back to Projects Gallery
Project Overview

Execution & Technical Scope

The Ganga river crossing at 4,027 metres was, at time of completion, the world's longest 26" HDD river bore — a record subsequently surpassed by TESPL's own Brahmaputra crossing in 2026. The crossing was executed using the intersection method — two independent bores drilled from opposite banks to meet precisely underground — deployed across 4 kilometres of alluvial geology comprising sand, silt, and small gravel. Two 1100 American Auger rigs were deployed simultaneously, supported by TESPL's 500-tonne proprietary pipe thruster to manage pullback loads at this distance and diameter. The project was completed in 76 days — a record duration for a crossing of this scale and complexity.

Site Photos & Visual Records

Ganga River Crossing site operation

Project Video

To show this video, allow content from YouTube. They may use their own cookies.

Open on YouTube instead

Key Statistics

  • Length4,027m
  • Diameter26" main line + 6" auxiliary line
  • Depth49.9m
  • GeologySand and silt with small gravel
  • Equipment2 × 1100 American Augers + TESPL 500T pipe thruster
  • Client / OwnerNumaligarh Refinery Ltd / Engineers India Ltd
  • LocationBihar, India
  • Year Completed2024