HDD / Rabigh (Jeddah KSA)
Master Gas System Expansion Phase -3 , Package 15
3790.06 Mtr / 16'' Steel pipe+12'' Steel pipe+6'' Steel pipe+4'' HDPE Pipe / KPIL/ Saudi Aramco / Rabigh (Jeddah KSA)
Back to Projects GalleryProject Overview
Execution & Technical Scope
The overall project objective is to expand the Master Gas System (MGS) capacity based on December 16, 2021 sales gas forecast which reaches 17.48 BSCFD by 2030.The main objective is to Drive the conversion of powerplants from oil to natural gas,which diversifies the national energy and Supports Economic growth.
Site Photos & Visual Records

Key Statistics
- Length3790.06 Mtr
- Diameter16'' Steel pipe+12'' Steel pipe+6'' Steel pipe+4'' HDPE Pipe
- Depth9 Mtr
- GeologyMix Ground with sand, Boulders and Rock
- EquipmentDD220 American Auger Drilling Rig Vermeer D130 x 150 Drilling Rig
- Client / OwnerKPIL/ Saudi Aramco
- LocationRabigh (Jeddah KSA)
- Year Completed2026