Horizontal Directional Drilling (HDD) is a trenchless method that utilises advanced drilling equipment to install pipelines, cables, and conduits underground along a predetermined path.

24” X 3,558 M

Completed India’s longest HDD
crossing at Brahmaputra River, India

24” X 3,800 M

Installing Asia’s longest HDD crossing
at Mahanadi River

16” AND 6” X 1,450 M

Completed World’s then-deepest HDD
crossing at 140 meters depth at
Chambal River, India

This innovative approach provides a flexible and efficient solution for situations where conventional open-cut methods are not feasible, environmentally or economically viable, or not permitted. HDD is particularly advantageous in densely populated urban areas, or where various obstacles, and difficult terrains, such as shore approaches, swamps, and river crossings, lie along the proposed route.

With HDD, the pipeline or cable land disturbance is only required at the entry and exit points, and the pipeline or conduit is installed seamlessly underneath the obstacle, minimizing environmental impact and maximizing efficiency.

EQUIPMENT DETAILS

S. No. RIGS FLEET QTY
1 Rigs above 400 Ton Pulling Capacity 3
2 Rigs between 250-400 10
3 Rigs between 100-250 5
4 Rigs between 30 - 100 4
Most of our Drilling Rigs are from American Augers from the USA and Herrenknecht from Germany.

APPLICATION

OFFSHORE WIND FARMS: INSTALLING ELECTRICAL CABLES FROM SEA TO SHORE.

OIL AND GAS
PIPELINES

ELECTRICAL
TRANSMISSION LINES

KEY PROJECT REFERENCES

KEY Project References

JDN Project

Taiwan's efforts in promoting green energy have led to the development of wind farms along its coast. The prestigious Project Formosa II was awarded to Jan De Nul (JDN) for the installation of windmills and cables.

Read more
KEY Project References

LNG TERMINAL

CPC planned to distribute LNG by crossing the Taichung Harbour through a pipeline measuring 36" x 1750 metres and 12" x 1900 metres. Trenchless was entrusted with this project, which required laying pipes without digging any trenches through the harbour.

Read more
KEY Project References

VASHI CREEK

Trenchless was tasked with installing a pipeline for BPCL from Mumbai to Manmad, involving the drilling of an 18" x 2600 metre and 6" x 2600 metre pipe using the HDD and intersection approach.

Read more
KEY Project References

MAHANADI 3000

With this massive project on a tight schedule, Trenchless was commissioned to drill two pipelines using trenchless technology.